Delhi-Mumbai Expressway: Badnawar-Timarwani Section Approved

Delhi-Mumbai Expressway: Badnawar-Timarwani Section Approved.webp

New Delhi, March 10 The Cabinet approved the four-laning of a section of the Delhi-Mumbai expressway in Madhya Pradesh on a hybrid annuity mode at a cost of ₹3,839.42 crore on Tuesday.

The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, approved the development of a 4-lane corridor from the Badnawar-Petlawad-Thandla-Timarwani section of NH-752D, which is 80.45 kilometers long, according to an official release.

The construction period for the project is 24 months.

The approved corridor will provide connectivity from Ujjain to the Timrawani interchange on the Delhi-Mumbai Expressway (DME).

The primary purpose of the proposed four-lane project corridor is to improve travel efficiency and reduce travel time by approximately an hour.

The 70.40 km Ujjain–Badnawar section has already been upgraded from 2 lanes to 4 lanes.

The Badnawar–Timarwani stretch is an existing intermediate lane (5.5m) with poor geometry (speed 20-50 kmph). Upgrading this section will complete the direct 4-lane connectivity from Ujjain to the Timarwani interchange on the Delhi-Mumbai expressway (DME) with a speed of 80-100 kmph, the release said.

The Timarwani–Thandla–Petlawad–Badnawar–Ujjain corridor is the shortest route for traffic from Gujarat and Maharashtra to Ujjain.

"Upgrading the Timarwani–Badnawar section will strengthen inter-state connectivity and enable efficient traffic movement, and will also address the increased traffic during the Simhastha Kumbh Mela in April 2028," the release said.

It further stated that the proposed project provides high-speed connectivity designed for improved safety and uninterrupted traffic movement, reducing travel time, congestion, and operating costs.

The project will enhance the basic infrastructure in the region, contributing to the overall economic development of the Dhar and Jhabua districts in the state of Madhya Pradesh, it added.
 
Tags Tags
badnawar delhi-mumbai expressway dhar district economic development highway construction hybrid annuity infrastructure development jhabua district madhya pradesh nh-752d petlawad roadway upgrade thandla timarwani transportation ujjain
Back
Top