New Delhi, March 27 Ceigal India on Friday said its subsidiary, Ceigall Infra Projects Pvt Ltd (CIPPL), has secured a contract worth ₹603 crore from NHAI for the construction of a six-lane, access-controlled spur road in Punjab.The project involves developing a 10.300-km stretch starting from...
access-controlledroad
ceigall india
ceigall infra projects
epc (engineering procurement construction)
highway construction
hybrid annuity mode
infrastructure engineering
infrastructure project
national highways authority of india
nh-205a
nhai
o&m (operation and maintenance)
punjab
spur road
zirakpur bypass
Bhubaneswar, March 3 The NHAI has awarded the contract for the construction of a six-lane, access-controlled greenfield Capital Region Ring Road (Bhubaneswar bypass) project in Odisha, which is expected to be completed within 30 months from the start of work.The National Highways Authority of...
access-controlledroad
bhubaneswar bypass
bilipada
capital region ring road
gobindpur
greenfield project
hybrid annuity mode
infrastructure projects
national highways authority of india
nhai
odisha
rameshwar
road construction
six-lane road
tangi